Aircraft carrier/Catalogs: Difference between revisions

From Citizendium
Jump to navigation Jump to search
imported>Howard C. Berkowitz
imported>Howard C. Berkowitz
Line 82: Line 82:
{{r|USS Hornet (CV-12)||**}} Reconstructed to SCB-27A design by the New York Naval Shipyard. Work began in July 1951; recommissioned as CVA-12 in September 1953.
{{r|USS Hornet (CV-12)||**}} Reconstructed to SCB-27A design by the New York Naval Shipyard. Work began in July 1951; recommissioned as CVA-12 in September 1953.
{{r|USS Hancock (CV-19)||**}} Reconstructed to SCB-27C design by the Puget Sound Naval Shipyard. Work began in December 1951; recommissioned as CVA-19 in February 1954.
{{r|USS Hancock (CV-19)||**}} Reconstructed to SCB-27C design by the Puget Sound Naval Shipyard. Work began in December 1951; recommissioned as CVA-19 in February 1954.
{{r|USS Intrepid (CV-11)||**}} Reconstructed to SCB-27C design by the Newport News Shipbuilding and Dry Dock Co. Work began in April 1952; recommissioned as CVA-11 in June 1954.
{{r|USS Intrepid (CV-11)||**}} Reconstructed to SCB-27C design by the Newport News Shipbuilding and Dry Dock Co. Work began in April 1952; recommissioned as CV-11 in June 1954.
{{r|USS Ticonderoga (CV-14)|USS Ticonderoga (CV-14)/(CVA-14)|**}}  
{{r|USS Ticonderoga (CV-14)|USS Ticonderoga (CV-14)/(CVA-14)|**}}  
{{r|USS Shangri-La (CVA-38)||**}} Reconstructed to SCB-27C design by the Puget Sound Naval Shipyard. Work began in October 1952 and was extended to include SCB-125 features; recommissioned in January 1955.
{{r|USS Shangri-La (CV-38)||**}} Reconstructed to SCB-27C design by the Puget Sound Naval Shipyard. Work began in October 1952 and was extended to include SCB-125 features; recommissioned in January 1955.
{{r|Lexington (CVA-16)||**}} Reconstructed to SCB-27C design by the Puget Sound Naval Shipyard. Work began in September 1953 and was extended to include SCB-125 features; recommissioned in August 1955.
{{r|USS Lexington (CV-16)||**}}
{{r|Bon Homme Richard (CVA-31)||**}} Reconstructed to SCB-27C design by the San Francisco Naval Shipyard. Work began in May 1953 and was extended to include SCB-125 features; recommissioned in September 1955.
{{r|Bon Homme Richard (CV-31)||**}} Reconstructed to SCB-27C design by the San Francisco Naval Shipyard. Work began in May 1953 and was extended to include SCB-125 features; recommissioned in September 1955.
{{r|Forrestal-class}}
{{r|Forrestal-class}}
{{r|USS Forrestal (CV-59)|''USS Forrestal'' (CV-59)|**}}  
{{r|USS Forrestal (CV-59)|''USS Forrestal'' (CV-59)|**}}  

Revision as of 22:28, 16 April 2011

This article is developing and not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
Catalogs [?]
 
An informational catalog, or several catalogs, about Aircraft carrier.

Ship classes and unique ships

Imperial Japanese Navy

United Kingdom

United States

Second World War

Large carriers

Cold War

New types

Aircraft

Imperial Japanese Navy

Russia

United Kingdom

United States

Second World War

Early jets and Korean War

Vietnam Era

Generation 4-4.5

Current and future