FC-MSR nuclear reactor: Difference between revisions
Jump to navigation
Jump to search
imported>David MacQuigg |
imported>David MacQuigg (→Cost) |
||
Line 25: | Line 25: | ||
== Cost == | == Cost == | ||
Specs for a 500MWe plant:<br/> | |||
'''Plant cost per KW (including building but not land, permits or licensing):'''<br/> | '''Plant cost per KW (including building but not land, permits or licensing):'''<br/> | ||
'''Operating cost per | '''Operating cost per KWh (including fuel and maintenance):'''<br/> | ||
'''Initial fuel load:'''<br/> | |||
'''Fuel consumption per day:'''<br/> | |||
== Notes and References == | == Notes and References == | ||
{{Reflist|2}} | {{Reflist|2}} |
Revision as of 17:09, 4 January 2022
- See also: Nuclear_power_reconsidered
Molten chloride salt fast reactor[2] (MCSFR) refers to a proposed reactor design with no moderator, capable of burning spent nuclear fuel and bomb cores.[3] This article should address the issues raised in the parent article Nuclear power reconsidered.
Safety
Accidental overheating. Add text here.
Leakage of Radioactivity Add text here.
Sabotage Add text here.
Waste Management
Add text here.
Weapons Proliferation
UCS says all MSRs require on-site fuel processing. ThorCon nuclear reactor does not.
We need more details on this reactor.
Cost
Specs for a 500MWe plant:
Plant cost per KW (including building but not land, permits or licensing):
Operating cost per KWh (including fuel and maintenance):
Initial fuel load:
Fuel consumption per day:
Notes and References
- ↑ This is a footnote to an image caption.
- ↑ This is a footnote with LINK to an external reference.
- ↑ Elysium Industries MCSFR - Ed Pheil, the designer, speaks at Thorium Energy Alliance 2020, https://www.youtube.com/watch?v=_ou_xswB2b0