Cost of nuclear power

From Citizendium
Revision as of 09:35, 21 August 2022 by David MacQuigg (talk | contribs) (→‎Cost of new designs: source for ThorCon costs)
Jump to navigation Jump to search
(CC) Image: Jessica Lovering
Fig.1 Add image caption here.[1]

Historical Costs

see Fig.1

Cost of new designs

ThorCon MSR:
$1200 per kW + $0.03 per kWh [2]

Cost of alternatives

Rooftop Solar (no batteries):

$2,900 per kW (nameplate), $11,600 per kW avg (25% Capacity Factor)

Wind Turbines

$770–$850 per kW (nameplate), down from $1800 in 2008.[3]
$3240 per kW avg (25% Capacity Factor)

Batteries:

Lead-Acid: $300 per kWh
Li-ion:

Hydrogen:

$2 per kg promised by mid 2020s[4]
$1 per kg ten-year goal set by DOE[5]
$0.12 per kWh electrical energy storage cost, assuming $2 per kg of H2, and 50% overall efficiency

Notes and References