Talk:Mumbai Metro
Jump to navigation
Jump to search
Workgroup category or categories | Engineering Workgroup [Editors asked to check categories] |
Article status | Developed article: complete or nearly so |
Underlinked article? | No |
Basic cleanup done? | Yes |
Checklist last edited by | Petréa Mitchell 12:06, 22 April 2007 (CDT) |
To learn how to fill out this checklist, please see CZ:The Article Checklist.
This article is intended to document the progress, salient features and facts about the Mumbai Metro. As such this is part of the "Mumbai Public Transportation" classification according to WP; none given in CZ (yet). Any improvements/corrections/additions/deletions welcome, though please discuss first.
Partho Choudhury 14:40, 3 April 2007 (CDT)
Categorization is pending
Partho Choudhury 14:41, 3 April 2007 (CDT)
Mash up of Mumbai Metro Phase 1 (VAG section)
This was created on 5th April 2007, and is open to public viewing on Google Maps. Please feel free to suggest changes/improvements.
Partho Choudhury 09:14, 8 April 2007 (CDT)
Categories:
- Engineering Category Check
- General Category Check
- Category Check
- Advanced Articles
- Nonstub Articles
- Internal Articles
- Engineering Advanced Articles
- Engineering Nonstub Articles
- Engineering Internal Articles
- Developed Articles
- Engineering Developed Articles
- Developing Articles
- Engineering Developing Articles
- Stub Articles
- Engineering Stub Articles
- External Articles
- Engineering External Articles
- Engineering Underlinked Articles
- Underlinked Articles
- Engineering Cleanup
- General Cleanup
- Cleanup